Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel Fugro AEX:FUR.NL, NL00150003E1

  • 23,580 26 apr 2024 17:38
  • +0,180 (+0,77%) Dagrange 23,320 - 23,760
  • 283.128 Gem. (3M) 372,9K

Q2-2022 draadje voor iedereen! Succes

2.735 Posts
Pagina: «« 1 ... 86 87 88 89 90 ... 137 »» | Laatste | Omlaag ↓
  1. forum rang 5 RobS 19 mei 2022 08:28
    quote:

    Belgam21 schreef op 18 mei 2022 23:53:

    www.hln.be/binnenland/belgie-denemark...
    Ik heb begrepen dat Heine als bevoorrechte leverancier in Esbjerg bij de ondertekening aanwezig was als gast! Ze moeten hem te vriend houden want ja de marges kunnen de pan uitstijgen bij monopolistisch concurrentie!
  2. forum rang 5 Hans2021 19 mei 2022 10:09
    quote:

    RobS schreef op 19 mei 2022 08:28:

    [...]

    Ik heb begrepen dat Heine als bevoorrechte leverancier in Esbjerg bij de ondertekening aanwezig was als gast! Ze moeten hem te vriend houden want ja de marges kunnen de pan uitstijgen bij monopolistisch concurrentie!
    Daar geloof ik niets van. Wat is je bron ?
  3. forum rang 6 Bergonzi_deleted 19 mei 2022 12:02
    quote:

    Jalen schreef op 19 mei 2022 11:23:

    We houden ons relatief goed staande vandaag. Maar de kommer en kwel aan de overkant is nog niet voorbij. In samenhang met de expiratie voorzie ik dat we onze tijd maar beter buiten kunnen doorbrengen de komende paar dagen..;-)
    heb ook een beetje het idee dat de koersen weer even gunstig gezet moeten worden voor de expiratie van morgen .. naja, de inkopen bij dit soort dalingen blijken meestal wel lucratief
  4. forum rang 5 Lekker Truitje 19 mei 2022 13:15
    trouwens een nieuw persbericht van Fugro op Fugro.com/media-center/news :

    19 May 2022
    Fugro helps engineers design sustainable transportation infrastructure in Texas

    Fugro recently completed a year-long geotechnical investigation for infrastructure solutions firm HNTB to support the safe design of a new light rail transit tunnel in downtown Austin, Texas. enz. enz.
    Kan tot nieuwe opdrachten leiden.
    Jammer inderdaad, zoals ik geloof de heer IQ ook al zei, dat ze niet veel ontvangen opdrachten vermelden, die moeten er in deze tijd gewoon in flinke bedragen binnenkomen. Blijkt ook uit de stijgende orderportefeuille bij de resultaten van 31-12-21. Dat is bijv. bij de BAM wel even anders, die publiceren de een na de andere order. Werkt enorm koers-stimulerend en misschien ook wel een reclame-uithangbord naar derden toe. Al kan BAM dat dan misschien weer wat harder nodig hebben dan de Fugro.
  5. forum rang 5 RobS 19 mei 2022 13:17
    quote:

    Lekker Truitje schreef op 19 mei 2022 13:15:

    trouwens een nieuw persbericht van Fugro op Fugro.com/media-center/news :

    19 May 2022
    Fugro helps engineers design sustainable transportation infrastructure in Texas

    Fugro recently completed a year-long geotechnical investigation for infrastructure solutions firm HNTB to support the safe design of a new light rail transit tunnel in downtown Austin, Texas. enz. enz.
    Kan tot nieuwe opdrachten leiden.
    Jammer inderdaad, zoals ik geloof de heer IQ ook al zei, dat ze niet veel ontvangen opdrachten vermelden, die moeten er in deze tijd gewoon in flinke bedragen binnenkomen. Blijkt ook uit de stijgende orderportefeuille bij de resultaten van 31-12-21. Dat is bijv. bij de BAM wel even anders, die publiceren de een na de andere order. Werkt enorm koers-stimulerend en misschien ook wel een reclame-uithangbord naar derden toe. Al kan BAM dat dan misschien weer wat harder nodig hebben dan de Fugro.
    was het bericht van 13.07 uur.
    Ze mogen vaak niet publiceren in opdracht van de opdrachtgever gas/olie industrie kijk de berichten van nr 36 maar na.
  6. forum rang 5 RobS 19 mei 2022 14:31
    Vattenfall werkt aan windmolen die ook waterstof produceert
    ABERDEEN (AFN) - Vattenfall bouwt voor de kust van Schotland naar eigen zeggen ’s werelds eerste waterstof producerende windturbine op zee. Daarvoor wordt op een bestaande molen een zogeheten electrolyser geplaatst waarmee water gesplitst kan worden in zuurstof en waterstof. De waterstof wordt dan met een pijpleiding naar land vervoerd.

    Volgens het Zweedse energieconcern gaat het om een proefproject dat mogelijk is gemaakt dankzij een miljoenenbijdrage van de Britse overheid. Het is de bedoeling dat zo straks elke dag voldoende waterstof gemaakt kan worden waarmee een waterstofbus 24.000 kilometer zou kunnen rijden.

    "Het project zal onderzoeken hoe fossielvrije waterstof veilig en tegen lage kosten kan worden geproduceerd om zo de weg naar grootschalige uitrol en commerciële productie te versnellen", legt projectmanager Wiljan Harder van Vattenfall uit. De werkzaamheden gaan per direct van start om de eerste productie in 2025 te kunnen leveren.

    Waterstof wordt gezien als een alternatief voor het gebruik van olie en aardgas en gaat waarschijnlijk een belangrijke rol spelen bij het verduurzamen van de industrie. Het is daarnaast bekend dat de haven van Rotterdam een belangrijk knooppunt wil worden voor de aanvoer en verspreiding van waterstof in Europa.

    (ANP Redactie AFN/Economie, email economie(at)anp.nl, +31 20 560 6070)
  7. forum rang 5 nr36 19 mei 2022 20:27
    Fugro Mercator to survey Statkraft’s Irish offshore wind site

    PROJECT & TENDERS
    May 19, 2022, by Nadja Skopljak
    Fugro is set to kick off a geophysical survey campaign at the North Irish Sea Array (NISA) offshore wind project at the end of May.

    The 42-meter long survey vessel Fugro Mercator is expected to carry out the operations between 27 May and 30 June, weather permitting, at the site located off the coast of North County Dublin, Meath, and Louth.

    The survey will utilize multibeam echo sounders, sub-bottom profilers, side-scan sonar, and magnetometer, both hull-mounted and towed.

    Typically, the towed cable lengths will be about four times the water depth while acquiring survey data.

    Work will be conducted during 24hr operations.

    Source: NISA’s Marine Notice
    NISA is one of the seven projects the Irish government designated as relevant to be fast-tracked through the then new marine planning regime.

    Statkraft secured a foreshore license for site investigation at the project from the Irish government at the end of 2021.

    Two months ago, Irish Minister for the Environment, Climate and Communications, Eamon Ryan TD, invited applications from the first batch of offshore wind projects, including NISA, for Maritime Area Consents (MACs).

    The project will comprise between 30 to 36 turbines that will deliver around 530 MW of capacity. Construction is expected to begin in 2024, with commissioning planned for 2026.

    www.offshore-energy.biz/fugro-mercato...
  8. forum rang 5 nr36 19 mei 2022 20:29
    ???????From strategy to reality

    19 MAY 2022
    BY SEAWORK PRESS FP
    Maritime & Coastguard Agency (MCA)
    SEA-KIT International
    Commercial Marine Conferences
    USVs
    Fugro
    XOCEAN
    Zelim
    Ocean Infinity
    SHARE THIS ARTICLE

    Renate Schreiber, Global Business Line Director for Marine Asset Integrity, Fugro is to give the keynote speech at the Commercial Marine conference ‘USV’s growing role in the Commercial Marine Market’.

    Renate’s keynote entitled ‘From strategy to reality: the future has arrived’ will take delegates through developments at Fugro; the offshore industry is undergoing a remote and autonomous revolution.

    Building on its innovations in robotics, remote operations and real-time data analytics & advice, Fugro is transitioning towards a new way of working, providing sustainable solutions for a safer and more liveable world. This presentation shares the exciting adventure of turning strategy into innovations and ultimately into commercial solutions.

    Taking place in person and online on Day Two of Seawork on Wednesday 22 June, the half-day conference explores the challenges, changes and emerging opportunities in today’s and tomorrow’s commercial marine and workboat sector.

    Renate will be joined by Liam Campbell - Commercial Director at Sea-Kit International, Dan Hook - Chief Technology Officer at Ocean Infinity, Katrina Kemp - Autonomy Technical Specialist Maritime Future Technologies at Maritime & Coastguard Agency, Samuel Mayall – CEO of Zelim and Shep Smith - Chief Technology Officer at XOCEAN
  9. forum rang 5 nr36 19 mei 2022 20:31
    Hydrogen Turbine Project Secures UK Government Funding

    May 19, 2022, by Adnan Durakovic
    Vattenfall has been awarded GBP 9.3 million in innovation funding from the Net Zero Innovation Portfolio Low Carbon Hydrogen Supply 2 fund by the UK government for the Hydrogen Turbine 1 (HT1) project offshore Aberdeen, Scotland.

    The funding will be used to develop the world’s first hydrogen-producing offshore wind turbine, with the electrolyzer sited directly onto an existing operational turbine, Vattenfall said.

    The pilot project at Vattenfall’s 97 MW Aberdeen offshore wind farm, also known as the European Offshore Wind Deployment Centre (EOWDC), will have an output of 8 MW and will be able to produce enough hydrogen every day to power a hydrogen bus to travel 24,000 kilometers. The hydrogen will be piped to shore at Aberdeen Harbor.

    ”We are very happy with the Government funding. Placing hydrogen electrolyzers on offshore wind turbines is likely to be the quickest and cheapest way of providing fossil-free hydrogen at scale,” said Danielle Lane, UK Country Manager for Vattenfall.

    HT1 aims to be the first in the world to test the full integration of hydrogen production with an offshore wind turbine. The project will also map out development and consent processes for large-scale hydrogen projects co-located with offshore wind farms to speed up future development, Vattenfall said.

    HT1 consists of hydrogen production equipment including desalination, electrolysis, and associated balance-of-plant closely integrated with the turbine power electronics, physically coupled with the turbine, on an extended platform which will encircle the base of the turbine.

    Turbine power will be dedicated to hydrogen production, and the electrolyser is expected to operate without requiring energy supply from the national grid.

    The hydrogen will be transported to shore via pipeline for processing and delivery to end-users.

    To accelerate demonstration of the pilot and maximise cost efficiencies, Vattenfall will aim to commence operation by early 2025.

    SUBSCRIBE TO OUR FREE DAILY NEWSLETTER
    Back in December 2021, Vattenfall awarded Fugro with a contract to carry out a geoscience survey and subsequent data processing and reporting for a proposed hydrogen pipeline route connecting the wind farm to the Aberdeen Port.

    The developer has since also submitted applications for pipeline route surveys with Marine Scotland, and for an Environmental Impact Assessment (EIA) Screening Opinion Request accompanied by a report.
2.735 Posts
Pagina: «« 1 ... 86 87 88 89 90 ... 137 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Fugro is het schoolvoorbeeld van een geslaagde turnaround

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links