Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel ArcelorMittal AEX:MT.NL, LU1598757687

  • 23,750 26 apr 2024 17:37
  • +0,210 (+0,89%) Dagrange 23,700 - 24,080
  • 2.295.626 Gem. (3M) 2,5M

Arcelor Mittal juni 2019

1.168 Posts
Pagina: «« 1 2 3 4 5 6 ... 59 »» | Laatste | Omlaag ↓
  1. Running man 3 juni 2019 15:17
    quote:

    Banks schreef op 3 juni 2019 15:11:

    We trekken wat bij, of is dat nog even onder het motto, bijtrekken en daarna omlaag trekken?
    Laat de VS ons vandaag eens positief verrassen! Gewoon nergens op gebaseerd, alleen maar terug naar de slotkoers van vrijdag of liever nog 'n paar centjes in het groen.
  2. forum rang 4 Yes we can 3 juni 2019 16:43
    quote:

    Kogovus schreef op 3 juni 2019 16:33:

    [...]

    Slaapt er geen seconde minder van en vreet er geen biefstuk minder door.
    Oh jawel hoor, zijn achterban van republikeinen zijn typisch de beter begoede amerikanen. In het kader van zijn herverkiezing kan hij zich echt niet permitteren dat de US in een recessie terecht komt. De kans daarop neemt toe en wordt nu bevestigd met cijfers
  3. forum rang 10 voda 3 juni 2019 18:47
    ArcelorMittal Kryviy Rih Inks Contract With CISDI For BF 9 Upgrade

    ArcelorMittal Kryvyi Rih signed an agreement with the Chinese company CISDI to upgrade blast furnace No 9. The contract worth nearly USD 30 million includes engineering design, supply of basic equipment, its supervision, supervision and training staff of the plant. Comprehensive modernization of the DP-9 will allow it to work out the next 20 years, to bring the rate of use of pulverized coal to 200 kilograms per ton of pig iron, to reduce the coke equivalent and to reconstruct the aspiration system, thereby reducing dust emissions to less than 20 milligrams per normal cubic meter and technological gas purification to a level no higher than 5mg / Nm3, which will give an opportunity to radically improve environmental performance. The project also provides for 100% granulation of blast furnace slag with the optimum flow of water to it and obtaining its required quality.

    ArcelorMittal Kryvyi Rih has four blast furnaces. "Nine" is the largest of them, its useful volume exceeds 5,000 cubic meters. It produces about half of all pig iron at the steel plant and is still considered one of the largest in Europe. After the modernization of the furnace, its capacity will increase to 10 thousand tonnes of pig iron per day on the existing raw materials and up to 12 thousand tons using sinter and pellets.

    ArcelorMittal Kryvyi Rih and CISDI have already begun to prepare the project, a joint design team has been formed, which includes experts from the investment and engineering department of the Krivoi Rog enterprise. 3D-scanning of objects, geodetic and topographic surveys have already begun.

    CISDI is part of the Chinese state corporation MinMetals and is one of the world leaders in implementing large-scale engineering projects for the metallurgical industry.

    Source : Strategic Research Institute
  4. forum rang 6 Koffiezondersuiker 3 juni 2019 19:01
    zat vanmorgen in de C14.00 Jun maar duurde me te lang. Maar Arcelor toch een voor zijn doen goede dag eruit geperst.

    Vervolgens nog in de TL9.50 van ING maar -wijs- verkocht vlak voor 17.30 ondanks een sterke opleving in het eind vd handel. Het herstel was me te mager om te blijven zitten.

    Damn wat een slechte handelsweken sinds lange tijd.
    Het mág of kán nu even niet omhoog.
1.168 Posts
Pagina: «« 1 2 3 4 5 6 ... 59 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Herstel in zicht voor ArcelorMittal

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links