Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel BAM Groep Koninklijke AEX:BAMNB.NL, NL0000337319

  • 3,390 3 mei 2024 17:35
  • -0,028 (-0,82%) Dagrange 3,326 - 3,464
  • 2.640.209

BAM juli 2023

964 Posts
Pagina: «« 1 ... 41 42 43 44 45 ... 49 »» | Laatste | Omlaag ↓
  1. forum rang 6 OnoMatopee 28 juli 2023 09:36
    Network Rail gets set to start cliff resilience work
    July 28, 2023
    Resilience work on the cliffs between Dawlish and Holcombe to help protect the iconic coastal railway line for future generations is due to start this week.

    Network Rail will be installing a series of protection measures, from netting designed to retain the cliffs in some high-risk locations, as well as catch fences, which will stop any cliff material before it reaches the railway.

    The £34.7 million Government-funded project involves installing coir matting on the cliff face, followed by 19,700 square metres of stainless steel netting, secured by more than 6,000 soil nails drilled to depths of up to 13 metres into the face of the cliff.

    In an innovative move to deliver best value, the nails are part stainless and part galvanised steel. The galvanised part of the nails will be deeper in the cliff, so will be protected from corrosion.

    In the areas that fall within the Dawlish Cliffs Site of Special Scientific Interest (SSSI), temporary grey/blue matting will be installed over the cliff face for the safety of workers, which will be removed once the netting is installed. Coir matting won’t be installed in this area, so that as much of the cliff face as possible can still be seen.

    The work is expected to take until spring 2024 and is being carried out by contractor Bam Nuttall, who recently completed the new sea wall at Dawlish for Network Rail.

    Vegetation has been removed from some areas of the cliff face in preparation for the scheme. However, the biodegradable coir matting will encourage the regrowth of vegetation which will, in time, reappear through the stainless steel netting.

    Temporary haul roads have been laid at cliff-top locations so that materials can safely be transported to site from Bam Nuttall’s Teignmouth Road compound. Smaller compound sites will also be set up to prepare the grout that will be used to secure the nails in place.

    Phase 4 work, Dawlish.
    Network Rail senior programme manager Ewen Morrison said: “The work is part of the wider South West Rail Resilience Programme, which was set up following the storm of 2014 to help protect the railway between Dawlish and Teignmouth from the effects of extreme weather. It follows on from the construction of the new sea wall at Dawlish and the rockfall shelter just north of Parson’s Tunnel, which is nearing completion.

    “Most of the work will take place during the day but some activity can only be safely done on Saturday nights when trains aren’t running and we’d like to thank the community for their patience as we continue our work to protect this vital rail artery.

    “We are conscious of how special the red cliffs are for residents and visitors and we are working with Natural England on the areas that fall within the Dawlish Cliffs SSSI.”

    Alan Cox, BAM managing director of regions and transport, said: “BAM is delighted to be continuing to increase the resilience of this vital rail link to the South West. Ever since the original emergency repair work in 2014, we have established strong connections with both local supply chains and local businesses to ensure maximum benefit is derived from the scheme in the local area.

    “The wide variety of engineering solutions needed to achieve this resilience in a very challenging environment plays to our strengths. Together with Network Rail and the local stakeholders we aim to continue to deliver best value whilst minimising disruption to passengers and public alike.

    “The people of Dawlish have been incredibly supportive of our work to date, something that makes our work even more rewarding.”
  2. forum rang 8 HenkdeV 28 juli 2023 11:04
    quote:

    OnoMatopee schreef op 28 juli 2023 10:29:

    [...]nee,

    De winst per aandeel daalde over de verslagperiode op jaarbasis van 1,31 euro naar 0,77 euro.
    Het gaat hier om de winst per aandeel over het eerste halfjaar van 2022 (1,31 euro) en 2023 (0,77 euro).
    Maar in die winst per aandeel over 2022 zit een vrijval voorzieningen van 19 miljoen.
    Volgens is dat 0,84 euro per aandeel.
    Wanneer je dat van die 1,31 euro aftrekt, ontstaat er een heel ander beeld.

    Ook bijna alle ander cijfers waren over 2023 beter dan over 2022.
  3. forum rang 6 OnoMatopee 28 juli 2023 11:23
    quote:

    HenkdeV schreef op 28 juli 2023 11:04:

    [...]

    Het gaat hier om de winst per aandeel over het eerste halfjaar van 2022 (1,31 euro) en 2023 (0,77 euro).
    Maar in die winst per aandeel over 2022 zit een vrijval voorzieningen van 19 miljoen.
    Volgens is dat 0,84 euro per aandeel.
    Wanneer je dat van die 1,31 euro aftrekt, ontstaat er een heel ander beeld.

    Ook bijna alle ander cijfers waren over 2023 beter dan over 2022.
    da's waar
  4. forum rang 4 Xxxx 28 juli 2023 12:16
    quote:

    Daytripper schreef op 28 juli 2023 07:50:

    Uit Voda behaalde posting op Heijmans draadje :

    Dit valt me tegen terwijl alles is verbeterd !

    *Heijmans onderliggende EBITDA, ex Wintrack II H1 2023 49 miljoen euro tegen 67 miljoen euro H1 2022
    Blijkbaar heeft de markt het ook gezien alhoewel de hele beurs terug is
964 Posts
Pagina: «« 1 ... 41 42 43 44 45 ... 49 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

Tegenvallers drukken resultaten BAM

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links