Van beleggers
voor beleggers
desktop iconMarkt Monitor
  • Word abonnee
  • Inloggen

    Inloggen

    • Geen account? Registreren

    Wachtwoord vergeten?

Ontvang nu dagelijks onze kooptips!

word abonnee

Aandeel BAM Groep Koninklijke AEX:BAMNB.NL, NL0000337319

  • 3,788 19 apr 2024 17:35
  • -0,042 (-1,10%) Dagrange 3,758 - 3,814
  • 577.058 Gem. (3M) 1,4M

BAM december 2020

1.849 Posts
Pagina: 1 2 3 4 5 6 ... 93 »» | Laatste | Omlaag ↓
  1. forum rang 6 €d_Modus Vivendi 28 november 2020 14:45
    De laatste maand van het jaar kan het resultaat van 2020 nog wat opvijzelen.
    Na een valse start en een nog valser verloop in de laatste maand lijkt er eindelijk sinds 23-11 een iets meer dan lichte kentering te komen in de nabije toekomstige verwachting.
    Wie zich niet is rot geschrokken van het historische minimum lag al in winterslaap.
    Hoewel we weinig weten over de uiteindelijke afloop van de Duitse sluizen mogen we aannemen dat het meerwerk dit jaar is of wordt betaald. Dat Museum van de Future uit Dubai zal wel future blijven, het valt ook niet mee voor zo'n noodlijdende oliestaat om de rekening te voldoen. Welnu , toen kwam het Pensioenfonds PGGM vorige week als oude partner binnen met een groter aandeel in de PPS en ging het hek van de dam en het dak er af. De convertible van komend jaar komt hierdoor op een waarschijnlijk zorgeloze afhandeling. Dan de Afsluitdijk, die gaat Bam geen windeieren leggen, dat wordt een respectvol "uurtje factuurtje" nu is gebleken dat Rijkswaterstaat de foutieve waterstanden heeft aangeleverd. Eindelijk eens iets waar Bam geen schuld aan heeft en 3 jaar méér werk en vertraging oplevert.
    Dan hebben we Covid nog dat parten speelt. In Schotland een lockdown op een werk van Bam waar 18 personen besmet waren. Hoe het verder zal gaan in de werkuitvoering in Europa weet niemand. Een vaccin komt er aan, tijdlijn onbekend. Dan Brexit. Geen idee wat desastreuzer voor het VK wordt, Covid of No-Deal. In elk geval heeft de overheid vele vele miljarden beschikbaar gesteld voor de bouw en infra. Dat zal toch voor ons 'fonsie' positief moeten uitpakken. Deal of no deal. Alleen dat pond nog, wat zal daar mee gebeuren.

    Laten we even wachten met postings tot 1 december
  2. [verwijderd] 30 november 2020 22:25
    Miskleun met Afsluitdijk kost ministerie 53 miljoen euro

    De vertraging bij het project Nieuwe Afsluitdijk kost het ministerie van Infrastructuur 53 miljoen euro.

    Dat staat vermeld in de Najaarsnota die minister van Financiën Wopke Hoekstra maandag heeft vrijgegeven. Minister Cora van Nieuwenhuizen hulde zich tot nog toe in stilzwijgen over de hoogte van het schadebedrag.

    Onjuiste gegevens

    Het werk aan de Nieuwe Afsluitdijk was door Rijkswaterstaat aanbesteed voor 550 miljoen euro. Bij het ontwerp voor het nieuwe spuisluizencomplex zijn niet de juiste gegevens ingevoerd. Dat werk moet nu helemaal over. De renovatie van de Afsluitdijk loopt drie jaar vertraging op.

    Van Nieuwenhuizen betaalt de meerkosten uit het Deltafonds. Minister Hoekstra rept in zijn Najaarsnota van een fondsoverschrijding van 53 miljoen euro die ,,vrijwel volledig te wijten is aan een tegenvaller op het project Afsluitdijk als gevolg van een probleem rond de Hydraulische Randvoorwaarden’’.

    Een miljard

    Het Deltafonds is bedoeld voor allerlei projecten om Nederland te beschermen tegen hoog water. In dit fonds resteert voor 2021 nog een totaalbedrag van 1 miljard euro.

    Dinsdag vergadert de Tweede Kamer met de minister over het probleem met de Afsluitdijk.
  3. forum rang 6 €d_Modus Vivendi 1 december 2020 06:18
    Melding Substantieel Belang 27 nov 2020 Koninklijke BAM Groep N.V. door Norges Bank
    Bron: AFM | Substantieel Belang AFM | Substantieel Belang
    1 december 2020, 03:39
    Hieronder vindt u informatie uit het register substantiële deelnemingen en bruto shortposities. Deze is door de organisatie aan het AFM verstrekt.
    Verdeling in aantallen (longpositie)
    Soort aandeel Aantal aandelen Aantal stemmen Kapitaal­belang Stemrecht Wijze van beschikken Afwikkeling
    Gewoon aandeel 9.169.173 9.169.173 Reëel Reëel Rechtstreeks
    Gewoon aandeel 716.863 716.863 Potentieel Potentieel Rechtstreeks Fysieke levering
    Procentuele verdeling (longpositie)
    Soort aandeel Totale deelneming Rechtstreeks reëel Rechtstreeks potentieel Middellijk reëel Middellijk potentieel
    Kapitaal­belang 3,54 % 3,28 % 0,26 % 0 % 0 %
    Stemrecht 3,54 % 3,28 % 0,26 % 0 % 0 %

    van

    Kapitaal­belang 3,29 % 2,93 % 0,36 % 0 % 0 %
    Stemrecht 3,29 % 2,93 % 0,36 % 0 % 0 %

    Nogmaals, je hebt niets aan die gasten
  4. forum rang 6 €d_Modus Vivendi 1 december 2020 06:26
    €66m intended for children's hospital has been diverted to Covid-19 projects

    Construction of the new National Children's Hospital taking place in Dublin.
    Mon, 30 Nov, 2020 - 20:37
    Elaine Loughlin Political Correspondent

    Opposition leaders have raised serious questions after learning that €66m of funding allocated to the National Children's Hospital has been diverted into Covid-19 projects.

    Labour leader, Alan Kelly, has suggested that there is now a "profiling of the spending on the hospital happening" and called for clarity from the National Paediatric Hospital Development Board (NPHDB).

    "Are arguments and difficulties being created in order to slow down the construction, or are they all genuine issues between the contractor and the board, or is this impacting movement?" Mr Kelly asked.

    Social Democrats co-leader, Roisín Shortall, said the diversion of funds will have major impacts on next year's budget, as the money will still have to be found.

    It had been expected that the main contractor, BAM, would have been paid €325m for work on the hospital this year, but just €118.8m has been drawn down, the Department of Health has confirmed.

    This is €166m less than the pre-pandemic anticipated draw-down for the year to date and around €66m of this has now, instead, been pumped into Covid-19-related projects.

    Citing delay relating to the closure of the site, the department said funding is only provided for incurred expenditure, and there will, therefore, be an underspend on the project in 2020.

    The department confirmed to the Irish Examiner that a carry-over of €100m into 2021, the maximum allowable under public financial procedures, has been applied.

    "The balance of the underspend was used to fund emergency Covid work," a spokesperson said.

    Stephen Donnelly, the health minister, said a "revised cash-flow profile" has recently been received from the NPHDB, and the HSE capital plan has been adjusted accordingly.

    "The NPHDB is also working on a project update to take account of the impact of the delay experienced on the project to date, including that related to Covid, and this will have an impact on future cash flow," Mr Donnelly said in response to a parliamentary question from Ms Shortall.

    Ms Shortall said: "This is an absolute flagship project; there are serious questions around the way it has been handled, the way it has been project-managed from the very beginning."

    She said the hospital, which has already been dogged by delays and budget overruns, now needs to be finished as quickly, and as cost-effectively, as possible.

    Ms Shortall called on the minister to "grab a hold of it" to ensure costs do not balloon further and said there is a need for transparency, both from the board and the department.

    She said it is hard to track budget allocations for Covid-19 measures, because of the significant amount of money spent since the pandemic.

    Mr Kelly said: "There is profiling of the spending on the hospital happening, there is a significant underspend, and because of that, that money is now being transferred across to be spent on the Covid emergency measures.

    "This is an indisputable fact. The question we really need to ask Stephen Donnelly is whether part of this profiling, and delay in construction, is happening because the Government wants to divert money from the hospital to Covid emergency works across the country because it needs that funding, rather than anything driven by the fact that the progression of the hospital has slowed down. There's a big distinction there," he said.

    translate.google.com/translate?hl=nl&...
  5. forum rang 6 €d_Modus Vivendi 1 december 2020 07:18

    Bam brushes up for £20m makeover of Birmingham’s Selfridges building

    By Dave Rogers1 December 2020



    All 16,000 of store’s aluminium disks to be cleaned during work

    Bam has begun the task of removing and cleaning 16,000 aluminium disks under a £20m deal to revamp the façade of Birmingham’s Selfridges store.

    The Future Systems-designed department store was completed more than 17 years ago by Laing O’Rourke and quickly became a city landmark.

    selfridges 1

    Source: Shutterstock

    The store has been home to Selfridges for 17 years

    Part of the revamped Bullring shopping centre, completed by Sir Robert McAlpine, the store was opened in September 2003 and became the retailer’s third store outside London following those at the Trafford Centre and Exchange Square in Manchester.

    As well as cleaning the disks, Bam will add a new layer of insulation with the disks remounted on a repainted blue background.

    Bullring owner Hammerson said the store will stay open throughout the work which is expected to complete in 2022. Architect on the scheme is Scott Brownrigg.

    Scaffolding is currently going up at the site at night with the hoarding set to be covered in a patterned design drawn up by Birmingham-born fashion designer and artist Osman Yousefzada.

    Bam, which built the Harvey Nichols department store in Knightsbridge in 1880 when it was known as Higgs and Hill, is making Birmingham a stronghold for the firm. It is building a new 26-storey tower at 103 Colmore Row while it has carried out work on the first two buildings at Argent’s Paradise development.
  6. forum rang 8 HenkdeV 1 december 2020 08:50
    quote:

    Crusader schreef op 30 november 2020 22:25:

    Miskleun met Afsluitdijk kost ministerie 53 miljoen euro

    De vertraging bij het project Nieuwe Afsluitdijk kost het ministerie van Infrastructuur 53 miljoen euro.

    Dat staat vermeld in de Najaarsnota die minister van Financiën Wopke Hoekstra maandag heeft vrijgegeven. Minister Cora van Nieuwenhuizen hulde zich tot nog toe in stilzwijgen over de hoogte van het schadebedrag.

    Dat is een heel ander bedrag dan de eerder genoemde honderden miljoenen.
  7. forum rang 7 innicksname 1 december 2020 08:53
    quote:

    HenkdeV schreef op 1 december 2020 08:50:

    [...]

    Dat is een heel ander bedrag dan de eerder genoemde honderden miljoenen.
    Blijkbaar valt de schade mee. Dit is 10 procent bovenop het oorspronkelijke totale bedrag. Op zich prettig dat het geen extreme extra uitgave is. Blijft er meer over voor andere projecten.
  8. forum rang 7 innicksname 1 december 2020 09:36
    quote:

    Sarlat schreef op 1 december 2020 09:33:

    [...]

    2,05 staat op m'n verlanglijstje van 4 Dec : p
    Hopelijk ben ik lief genoeg geweest dit jaar.
    Eens zien of BAM voor goedheiligman wil spelen. En op 6 dec mogen de resterende shorters met de zak naar Spanje.

    @popie: neem jij die mee?
  9. [verwijderd] 1 december 2020 10:15
    quote:

    Crusader schreef op 30 november 2020 22:25:

    Miskleun met Afsluitdijk kost ministerie 53 miljoen euro

    De vertraging bij het project Nieuwe Afsluitdijk kost het ministerie van Infrastructuur 53 miljoen euro.

    Dat staat vermeld in de Najaarsnota die minister van Financiën Wopke Hoekstra maandag heeft vrijgegeven. Minister Cora van Nieuwenhuizen hulde zich tot nog toe in stilzwijgen over de hoogte van het schadebedrag.

    Onjuiste gegevens

    Het werk aan de Nieuwe Afsluitdijk was door Rijkswaterstaat aanbesteed voor 550 miljoen euro. Bij het ontwerp voor het nieuwe spuisluizencomplex zijn niet de juiste gegevens ingevoerd. Dat werk moet nu helemaal over. De renovatie van de Afsluitdijk loopt drie jaar vertraging op.

    Van Nieuwenhuizen betaalt de meerkosten uit het Deltafonds. Minister Hoekstra rept in zijn Najaarsnota van een fondsoverschrijding van 53 miljoen euro die ,,vrijwel volledig te wijten is aan een tegenvaller op het project Afsluitdijk als gevolg van een probleem rond de Hydraulische Randvoorwaarden’’.

    Een miljard

    Het Deltafonds is bedoeld voor allerlei projecten om Nederland te beschermen tegen hoog water. In dit fonds resteert voor 2021 nog een totaalbedrag van 1 miljard euro.

    Dinsdag vergadert de Tweede Kamer met de minister over het probleem met de Afsluitdijk.
    Dit is volgens de Leeuwarder Courant het bedrag waar het ministerie voor opdraait. Er staat (nog) nergens wat de andere betrokken partij(-en) bijdragen.
    Er was toch sprake van een 'deal'?

    www.lc.nl/friesland/Miskleun-met-Afsl...
1.849 Posts
Pagina: 1 2 3 4 5 6 ... 93 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.

Direct naar Forum

Premium

BAM: sterk slotkwartaal opsteker voor nieuwe strategie

Het laatste advies leest u als abonnee van IEX Premium

Inloggen Word Abonnee

Lees verder op het IEX netwerk Let op: Artikelen linken naar andere sites

Gesponsorde links